September 1997: A solution for drifting snow

Les Brown in Studio C
Longtime volunteer engineer Les Brown in KNOM’s Studio C.

September 25, 1997

Chief engineer Les Brown (pictured) has almost single-handedly built the extended fence around the AM tower, preparing for the mission’s higher-power, 25,000-Watt signal. Snow drifting has always been a problem there, and Les tries an innovative solution.

For (fence) pickets, he uses 1/2-inch plastic pipes, which he figures will be aerodynamic and won’t stop as much snow as wooden slats. It turns out to be an excellent decision. The needed material costs $931, and by doing it himself, Les figures he is saving the mission about $4,500 in labor.

Scroll to Top