Posts Tagged ‘John Johnson’
Sewer Line Struck, RMW Called In, But Repair Efforts Are Stalled in Gambell
RMW Program Coordinator John Johnson says about two feet of water need to be pumped out of the hole before the team can repair the main sewer line. As of mid-day today, at least five pumps are actively draining water out of the hole, but they haven’t gotten ahead of the flooded area.
Read More