780 AM | 96.1 FM 

“YOURS FOR WESTERN ALASKA”

(907) 443-5221

September 1997: A solution for drifting snow

September 25, 1997 Chief engineer Les Brown (pictured) has almost single-handedly built the extended fence around the AM tower, preparing for the mission’s higher-power, 25,000-Watt signal. Snow drifting has always been a problem there, and Les tries an innovative solution. For (fence) pickets, he uses 1/2-inch plastic pipes, which he figures will be aerodynamic and […]